Recommendation : 2. Anticipate the operation of services
Are methods in place to measure the actual consumption of the code in production and allow accurate sizing ?
Sustainable IT Infrastructure
C People
B Planet
B Prosperity
Difficulty
**
Priority
High
Récurrence
Periodic
Tests
Has the disk consumption been the subject of a dimensioning and an estimate during the DAT phases?
Precisions
In the absence of reliable metrics, the sizing of physical components is based on estimates that may not be adapted to real use cases. These metrics should be applied according to the following two principles: adjusting the sizing, and identifying overconsumption, which should be then systematically reviewed and addressed.
Use Case
Configuration management
Additional elements
Operational issues related to the project
Posts
Rule for assessing the level of compliance of the criterion
0 / 0
Life cycle
Administration
5 other criteria related to the recommendation: Anticipate the operation of services
Life cycle
Are the environments other than production (DEV, QA, ...) switched off or decommissioned outside the ranges of use (at night, outside the test periods) ?
Sustainable IT Infrastructure
Is the hosting of applications densified ?
Life cycle
Are unused production environments outside of peak loads turned off or decommissioned ?
Software Design Sustainable IT
Are the definitions of SLA and QoS for each of the functions of the application architecture specified in accordance with the business uses ?
Software Design Sustainable IT
Is the digital service efficient all along its lifespan ?