Recommendation : 8. Anticipate impacts on production
Is the ability to evolve / modify the application studied ?
Life cycle
B People
B Planet
A Prosperity
Difficulty
*
Priority
Low
Récurrence
OnUpdate
Tests
Is the application in microservice mode?
Precisions
Responsible Digital is a process of continuous improvement which should allow progress to be made in reducing impacts.
Use Case
Backlog
Additional elements
Operational issues related to the project
Posts
Rule for assessing the level of compliance of the criterion
Formalized = 100 ; Planned = 75 ; Identified = 50 ; Ignored = 0 / 100
Life cycle
Maintenance
12 other criteria related to the recommendation: Anticipate impacts on production
Life cycle
Does the use of the service exclude certain software or hardware configurations ?
Software Design Sustainable IT
Does the use of the service make it possible to envisage software or hardware configurations that have less impact on the environment ?
Software Design Sustainable IT
Does the added value of the framework justify the weighting of the application ?
Software Design Sustainable IT
Does the frequency of use of the feature require it to be available all the time or can it be updated in the background (batch) ?
Sustainable IT Infrastructure
Is the app quick to start / stop ?
Software Design Sustainable IT
Are algorithms and processing optimized in the application ?
Software Design Sustainable IT
Is a compiled language used for performance and / or security aspects ?
Software Design
Are the benchmarks known, kept up to date, and made available to the entire project team ?
Software design
Is the inventory of the input data made available for reuse in other projects ?
Software design
Are the functionalities linked to regulated data processing (health, banking, etc.) validated in terms of interoperability ?
Software design
Is the implementation of new services linked to regulated data necessary and, if so, does it build on the base of available services ?
Life cycle
Are there any meetings planned so that the urbanization unit assesses the evolutions of the IS with regard to the design, the evolution put in place ?