Handbook of Sustainable Design of Digital Services

MENU
← go back
Ux/Ui    ODD#5     ODD#8     ODD#9     ODD#10     ODD#12     ODD#13    

Is the planet taken into account in the brain storming process, in order to integrate the ecological dimension (planet centric design) ?

Recommendation  Essential

Methodology

B People

A Planet

B Prosperity

Difficulty

***

Priority

High

Récurrence

OnUpdate

Tests

Is the planet centric toolkit known and used?

Precisions

Every design decision has an impact. If environmental and ecological issues are not at the heart of the analysis, no objective of controlling or reducing impacts will be taken into account and therefore respected.

Use Case

Systemc approach: planet centric is used

Planet Centric toolkit

Additional elements

Operational issues related to the project

Posts

Rule for assessing the level of compliance of the criterion

Formalisés = 100 ; prévus = 75 ; Identifiés = 50 ; Non = 0 / 100

Life cycle

Conception

7 other criteria related to the recommendation: Incorporate Sustainable IT into the major objectives of the project

Recommendation Essential

Methodology

In the brain storming process, are all stakeholders taken into account in their entire (human) dimension ?

Recommendation Essential

Methodology

Are the extra-financial added value of sustainble digital technology valued in the business model ?

Advice

Project Resources

Is a sustainable IT process planned at the level of project governance ?

Recommendation

Project Resources

Are Sustainable IT improvements identified and systematically planned ?

Recommendation

Project Resources

For the Sustainable IT aspects, do the project managers (project manager, product owner, etc.) have the same prerogatives as the business aspects ?

Recommendation

Project Resources

Is the deliverables's output (documentary production included) used upstream of the project and is it produced to allow it to be reused in subsequent projects ?

Advice

Project Resources

Is a budget on the 3Ps axes associated and monitored during the project ?