In the brain storming process, are all stakeholders taken into account in their entire (human) dimension ?

Recommendation  Essential

Methodology

A People

B Planet

B Prosperity

Difficulty

***

Priority

High

Récurrence

OnUpdate

Tests

Has stakeholder mapping been carried out? Is stakeholder prioritization done?

Precisions

Putting the User at the center of the reflection is the guarantee to cover the essential needs of your targets and to move in the right direction. By Users, we mean not only the end users of the service or product but also the various stakeholders of the project. Taking into consideration your users with a human and empathetic dimension allows you to enlarge yourcogitation and go beyond the economic and technological aspects of the project.

Use Case

Users profiles match all human dimensions to be corvered by sust. IT, to avoid digital exclusion

Stakeholders map template Human-Centered Design

Additional elements

Operational issues related to the project

Posts

Rule for assessing the level of compliance of the criterion

Formalisés = 100 ; prévus = 75 ; Identifiés = 50 ; Non = 0 / 100

Life cycle

Conception

7 other criteria related to the recommendation: Incorporate Sustainable IT into the major objectives of the project

Recommendation Essential

Methodology

Is the planet taken into account in the brain storming process, in order to integrate the ecological dimension (planet centric design) ?

Recommendation Essential

Methodology

Are the extra-financial added value of sustainble digital technology valued in the business model ?

Advice

Project Resources

Is a sustainable IT process planned at the level of project governance ?

Recommendation

Project Resources

Are Sustainable IT improvements identified and systematically planned ?

Recommendation

Project Resources

For the Sustainable IT aspects, do the project managers (project manager, product owner, etc.) have the same prerogatives as the business aspects ?

Recommendation

Project Resources

Is the deliverables's output (documentary production included) used upstream of the project and is it produced to allow it to be reused in subsequent projects ?

Advice

Project Resources

Is a budget on the 3Ps axes associated and monitored during the project ?