In the brain storming process, are all stakeholders taken into account in their entire (human) dimension ?
Methodology
A People
B Planet
B Prosperity
Difficulty
***
Priority
High
Récurrence
OnUpdate
Tests
Has stakeholder mapping been carried out? Is stakeholder prioritization done?
Precisions
Putting the User at the center of the reflection is the guarantee to cover the essential needs of your targets and to move in the right direction. By Users, we mean not only the end users of the service or product but also the various stakeholders of the project. Taking into consideration your users with a human and empathetic dimension allows you to enlarge yourcogitation and go beyond the economic and technological aspects of the project.
Use Case
Users profiles match all human dimensions to be corvered by sust. IT, to avoid digital exclusion
Stakeholders map template Human-Centered Design
Additional elements
Operational issues related to the project
Posts
Rule for assessing the level of compliance of the criterion
Formalisés = 100 ; prévus = 75 ; Identifiés = 50 ; Non = 0 / 100
Life cycle
Conception
7 other criteria related to the recommendation: Incorporate Sustainable IT into the major objectives of the project
Methodology
Is the planet taken into account in the brain storming process, in order to integrate the ecological dimension (planet centric design) ?
Methodology
Are the extra-financial added value of sustainble digital technology valued in the business model ?
Project Resources
Is a sustainable IT process planned at the level of project governance ?
Project Resources
Are Sustainable IT improvements identified and systematically planned ?
Project Resources
For the Sustainable IT aspects, do the project managers (project manager, product owner, etc.) have the same prerogatives as the business aspects ?
Project Resources
Is the deliverables's output (documentary production included) used upstream of the project and is it produced to allow it to be reused in subsequent projects ?
Project Resources
Is a budget on the 3Ps axes associated and monitored during the project ?