Skip to content
FR EN

Handbook of Sustainable Design of Digital Services

MENU
← go back
Strategy    ODD#12    

Can I recycle software component or existing content ?

Recommendation 

Project framing

B People

B Planet

A Prosperity

Difficulty

*

Priority

Medium

Récurrence

OnUpdate

Tests

Is there a repository of shared software bricks (authentication, user account base, generic interconnection APIs, etc.)?

Precisions

Modular design is a widely used business practice. Sustainable IT can benefit from these methods when each modular component is well described and its strengths or weaknesses are well identified.

Use Case

Project framing

Additional elements

Operational issues related to the project

Posts

Rule for assessing the level of compliance of the criterion

Reused components / Number of fatures

Life cycle

Revalorisation

13 other criteria related to the recommendation: Determine and plan the capacity to monitor and capitalize on the Digital components Project manager

Recommendation Essential

Emergence

Is sustainable IT compliance exposed to users ?

Recommendation

Project framing

Are each of the life cycle phases (start-up, maturity, shutdown) identified with specific actions ?

Recommendation

Project framing

Are LCA data reused in case of of an adaptation of an existing service ?

Recommendation

Project framing

If I decide to redo my service, what do I keep of the old one and how do I clean it from the canvas ?

Advice

Project framing

How are the end-of-life phases managed, from the start or at the end of a project ?

Advice

Project framing

Is awareness of "non-quality costs" shared by all internal stakeholders ?

Recommendation

Project framing

During an audit, are the following elements taken into account ?

Recommendation

Emergence

Are the indicators to measure the effectiveness of my Sustainable IT approach identified and monitored ?

Advice

Emergence

Are the tools to measure the effectiveness of my Sustainable IT approach identified and communicated ?

Recommendation

Emergence

Is the project's lifetime defined ?

Advice

Emergence

Are the experiences of past projects taken into account ?

Advice

Emergence

Are there plans to capitalize on the experience of this project for the future ?

Advice

Emergence

Do the indicators cover the elements for measuring, evaluating and estimating the level of Sustainable IT maturity, managing it, improving it and controlling it ?